Ready 4 Floors

April 5, 2018

New Treated Structures are now in place, with the old rotten Pill Bug eaten structures removed. Now it's time to level the floors and lay a sub floor of 24mm Ply on top of a 100mm layer of Foam Insulation. That's the hard dirty jobs done and things should move a bit faster now.

 

 

 

 